The AI infrastructure conversation runs on three numbers: chips, megawatts and debt. Missing from most of it is the rent. A large share of deployed AI compute does not sit in buildings its owner built; it sits in leased data center space billed per kilowatt of committed power per month. That unit, the dollar-kilowatt-month, is one of the few AI input prices still moving up, and in late 2026 the price list looks roughly like this.

The unit: per kW, not per rack
Colocation is quoted as a base rate in dollars per kilowatt per month under a modified gross lease. The rate buys space plus conditioned, backed-up power to your racks at an agreed redundancy tier. Electricity, cross-connects, remote hands and fit-out are typically billed on top. The industry has in recent years switched its quote sheet from racks to kilowatts, because a rack is no longer a fixed amount of anything: standard enterprise deployments still run 3 to 10 kW per rack, while AI colocation product is built for 20 to 100 kW or more per rack, and a 100 kW GPU rack can only be closed-loop liquid cooled.
Lane 1: the retail rack buyer
Small requirements pay list-price rates and little negotiation. Published US guides put a 1U to 2U slot at $79 to $150 a month, a quarter or half rack at $300 to $800, a full rack at $599 to $1,500, and a full cabinet in a major metro at $1,500 to $2,325 a month with 2 to 5 kW of licensed (not metered) power included. A 5 kW cabinet in New York starts around $1,750. On a per-kW basis that is $300 to $1,400, which is why everyone climbs off this lane as soon as they can.
Lane 2: wholesale, where the benchmarks live
CBRE tracks asking rates for 250 kW and larger requirements in eight primary North American markets. The numbers it publishes are the closest thing the industry has to a public price list:
- End of 2025: the primary-market average for a 250 to 500 kW requirement hit a record of about $196 per kW-month.
- Q1 2026: Chicago is the most expensive tracked market at $200 to $230 per kW-month, up 14.7% year over year. Northern Virginia runs $190 to $235. Atlanta rose 2% and Dallas-Fort Worth asking rents were unchanged.
- H1 2026: rates rose across every requirement size. 3 to 10 MW deployments gained 8.3%, 500 kW to 3 MW gained 7.9%, 10-plus MW gained 6.7% and 250 to 500 kW gained 4.3%, nearly double the 2.5% increase in the first half of 2025.
- For 10-plus MW deals, New York Tri-State asking rates jumped 19% in H1, Atlanta 14.5% and Chicago 9.7%. Northern Virginia rose only 1.5%, which CBRE attributes to limited transaction activity in the most supply-constrained market rather than softening prices. Large blocks in Northern Virginia still quote $160 to $185 per kW-month.
Lane 3: what the operators actually collect
Landlords disclose enough to see the discount curve inside their own books. Digital Realty's Q2 2026 earnings report new leasing in the Americas at $293 per kW-month for deals of 0 to 1 MW versus $156 for deals above 1 MW, with EMEA small-block rents at $269. A 1.9x spread for asking politely at the wrong size. In July the company signed two hyperscale leases worth $410 million of annualized base rent at 100% share.
Equinix still prices mostly per cabinet and reports $2,538 of average monthly recurring revenue per billed cabinet worldwide for Q2 2026, up about 6% year over year, on recurring colocation revenue of $1.77 billion in the quarter plus $453 million of interconnection. Its MRR grew 11% year over year, annualized gross bookings grew 23%, and management described a record backlog driven by AI demand. Iron Mountain's new and expansion leases cleared about $205 per kW-month on a GAAP basis in Q2, according to Colocation Scout's roundup of operator disclosures.
Lane 4: the global premium tier
Tight markets price far above the US mainland. CBRE's Q1 2026 global report puts Singapore at $330 to $475 per kW-month (average $403) with vacancy pinned at a structurally low 2% under the government's supply rationing, Tokyo at $280, Hong Kong at $295 and rising, Sydney at $188, and Frankfurt at $235 to $265, the highest in Europe. London's rates held roughly stable even as its vacancy ticked up to 8.6%. In Latin America, Sao Paulo quotes $130 to $190, cheaper than any US primary market, while Queretaro sits at $250 to $270 on hyperscale and AI demand.
Lane 5: the campus lease, where the headline numbers are wrong
The multi-hundred-megawatt AI deals in the news do not price at CBRE's rates. GR1D's analysis of disclosed AI campus leases signed in 2025 and 2026 works out to roughly $65 to $159 per kW-month over 10 to 15 year terms, with investment-grade tenants, big minimums and sometimes tenant-side fit-out. When a GPU cloud company announces a $10 billion lease, the implied $/kW is usually below what a 250 kW customer pays, which is the entire point of wholesale. Quoting CBRE's $196 average as "the cost of AI data center space" mixes the lanes.

Why the rent keeps rising
Supply has not kept up with demand no matter how much gets built. CBRE's H1 2026 report shows primary-market vacancy at a record low 1.4% despite record deliveries; Northern Virginia ended at 0.2% vacancy, Dallas-Fort Worth at a record-low 1.8%. Net absorption across primary markets hit 1,456.2 MW, up 11.7% year over year. Preleasing is now on 80.4% of all capacity under construction, up from 74.3% a year ago, and less than 1,500 MW of future capacity remains uncommitted across the primary markets, about six months of demand. Construction itself is getting more expensive: JLL's 2026 Global Data Center Outlook pegs the global shell-and-core average at $11.3 million per MW this year, up 6% from $10.7 million in 2025 and from $7.7 million in 2020, with tenant AI fit-out costing as much as $25 million per MW more. JLL also reports grid interconnection waits over four years in primary US markets, which is why the queue for powered land, not concrete, sets the price.
The fine print moves the real number
The base rate is the small end of the bill.
- Power pass-through roughly doubles it. At a $150 per kW base rate, a fully loaded 1 MW drawing 720,000 kWh a month at 14 cents per kWh and a 1.5 PUE adds about $151,000, bringing the total to around $301,000 a month, and utility rates vary by a factor of two between Texas (around 7.2 cents industrial average) and the national average (9.6 cents).
- Take-or-pay is spreading. CBRE reports minimum utilization floors of 60 to 85% of reserved power becoming common in US leases, so idle GPUs still bill.
- Lease structures are shifting from modified gross toward NNN, pushing taxes, maintenance and insurance onto tenants.
- Renewals reprice brutally. Brokers describe tenants moving from $75 to $130 to 150 per kW at renewal; Digital Realty expects 9 to 11% cash renewal spreads on top of that market drift.
- Incentives are thinner than they look: recent quotes collected by Colocation Scout included 1 to 2 free months at 250 to 500 kW and 2 to 3 above 1 MW, which amortizes to a few percent.
- Fit-out timing is now a cost line: CBRE says ready-for-service dates have expanded from weeks to months, and air-to-liquid conversions can run past six months.
- Regulation is entering the meter: Virginia's $0.011 per kWh large-load consumption tax took effect July 1, with New Jersey, Ohio, Oregon, Wisconsin, Florida and Delaware approving similar frameworks.
What to actually watch
For anyone budgeting AI compute in this market, the practical read is simple. If you need under 250 kW, you are paying $250 to $400-plus per kW-month on a rack rate card. If you need 250 kW to 10 MW in a US primary market, the realistic band in late 2026 is $160 to $235 before power, with Chicago now more expensive than Northern Virginia. If you need 100 MW, you negotiate a campus lease in a power-rich market and neither CBRE's table nor this post applies to you. What the lanes share is direction: token prices deflate at double-digit annual rates while the rent on the space under the GPUs has not had a down quarter in two years. The meter the AI buildout pays monthly is still on the way up.
Sources
- CBRE, North America Data Center Trends H1 2026: https://www.cbre.com/insights/books/north-america-data-center-trends-h1-2026
- CBRE, Global Data Center Trends 2026: https://www.cbre.com/insights/reports/global-data-center-trends-2026
- CBRE, North America Data Center Trends H2 2025: https://www.cbre.com/insights/books/north-america-data-center-trends-h2-2025
- JLL, 2026 Global Data Center Outlook: https://www.jll.com/en-us/insights/market-outlook/data-center-outlook
- Digital Realty Q2 2026 earnings release: https://investor.digitalrealty.com/news-releases/news-release-details/digital-realty-reports-second-quarter-2026-results
- Equinix Q2 2026 earnings presentation: https://investor.equinix.com/news-events/press-releases/detail/1114/equinix-reports-second-quarter-results-raises-2026
- Colocation Scout, Data Center Pricing Benchmarks 2026: https://colocationscout.com/data-center-pricing-benchmarks.html
- Colocation Scout, Colocation Pricing 2026: https://colocationscout.com/colocation-pricing.html
- GR1D, Colocation Pricing per kW in 2026: https://gr1d.us/insights/colocation-pricing-per-kw
- datacenterHawk, Colocation Pricing 2026 Guide: https://datacenterhawk.com/resources/fundamentals/colocation-data-center-pricing-a-2026-beginner-s-guide
- 515engine, Colocation Pricing 2026 (1 MW worked example): https://515engine.com/colocation-pricing
- Metro Colo Advisory, Colocation Pricing 2026: https://metrocoloadvisory.com/colocation-pricing-guide